Avoiding change orders begins long before construction ever starts. In many cases, the most expensive project changes are not caused by the work itself, but by gaps in planning, incomplete engineering, overlooked site conditions, or assumptions made too early in the process. When a project is properly planned from the beginning, many of those issues can be identified, addressed, and eliminated before they turn into delays or added costs.
One of the biggest factors that can lead to change orders is a lack of understanding of the site conditions. This is especially true when it comes to subsurface conditions. Without a thorough geotechnical report, project teams may not have a clear picture of what they are dealing with below the surface. That uncertainty can quickly lead to unforeseen conditions, design adjustments, additional labor, equipment changes, and material costs that were never included in the original scope. In many projects, this is one of the most common sources of change orders. This ties into underground utilities as well, mainly when looking at private utilities. The majority of contractors are tasked with public locations, a very common item taken on by the contractor for projects. The issue lies with private utilities such as irrigation, fiber optics, sewage lines, electrical etc. These distinctions with who locates what are critical to ensuring a smooth installation. Proper engineering also plays a major role in preventing project changes. When design documents are complete, coordinated, and reviewed carefully before the project begins, there is less room for conflict or missing information once work is underway. Good engineering helps ensure the scope is realistic, the installation plan is clear, and the project team is prepared for what to expect in the field. Communication is just as important as planning and engineering. Project owners, contractors, engineers, and field teams all need to be aligned from the beginning. If expectations are not clearly defined, problems can arise later that require additional work, extra materials, or a return to the jobsite. These remobilizations can become costly very quickly, especially when new equipment rentals, labor, and delivery schedules are involved. Change orders can often be traced back to items that were thought of after the fact. Whether it is a design detail, a scope clarification, a site condition, or a material need that was overlooked during preconstruction, these issues are usually preventable. Taking the time to review every part of the project early on helps reduce the chance of surprises once construction is already in progress. The bottom line is simple: fewer assumptions lead to fewer change orders. A project built on clear communication, complete planning, accurate engineering, and reliable site information is far more likely to stay on schedule and within budget. The goal is not just to react to problems, but to prevent them before they happen. By investing more time in preconstruction planning and coordination, teams can reduce risk, minimize change orders, and create a smoother project from start to finish. What are change orders in construction? Change orders are formal changes to the original scope of work, contract, cost, or schedule once a project is already underway. They usually happen when unexpected conditions, missing information, or scope changes arise. How can change orders be avoided? Change orders can often be reduced or avoided through proper planning, complete engineering, detailed scope review, accurate geotechnical reports, and clear communication between all project stakeholders. Why are geotechnical reports important? Geotechnical reports help identify subsurface conditions before construction begins. This information can prevent surprises below grade, which are often a major cause of change orders, delays, and added costs. What causes remobilization costs? Remobilization costs happen when crews, equipment, materials, or subcontractors have to return to the jobsite after the work has already started or been paused. These costs often come from changes, delays, or incomplete planning. How does poor communication lead to change orders? When project expectations are not clearly communicated, important details can be missed. That can lead to scope changes, rework, added materials, and schedule adjustments later in the project. Why is early planning so important? Early planning gives the project team a chance to identify risks, review the scope, confirm site conditions, and address potential issues before they become expensive problems in the field. What role do assumptions play in change orders? Assumptions often create risk because they replace verified information. When teams assume instead of confirming, they increase the chance of surprises that can lead to change orders. What is the best way to minimize construction change orders? The best way to minimize change orders is to focus on preconstruction preparation, accurate documentation, open communication, and realistic planning from the start.
0 Comments
Leave a Reply. |
AuthorSeamus Hennigan: Project Manager Archives
November 2026
Categories |
RSS Feed